This page (revision-69) was last changed on 26-Nov-2021 10:22 by kparrott

This page was created on 26-Nov-2021 10:22 by JLawler

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
69 26-Nov-2021 10:22 9 KB kparrott to previous
68 26-Nov-2021 10:22 9 KB jmyers to previous | to last APPROVAL_WIP_REC ==> APPROVAL_WIP_REC(System_Preference)
67 26-Nov-2021 10:22 9 KB JEscott to previous | to last
66 26-Nov-2021 10:22 9 KB JEscott to previous | to last
65 26-Nov-2021 10:22 9 KB JEscott to previous | to last
64 26-Nov-2021 10:22 9 KB JEscott to previous | to last
63 26-Nov-2021 10:22 9 KB JEscott to previous | to last
62 26-Nov-2021 10:22 9 KB JMyers to previous | to last
61 26-Nov-2021 10:22 9 KB JMyers to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 83 removed one line
Approvers may be replaced by a designated approver, known as Designated Approvers in [IEMDA] for a defined time frame or indefinitely. Approvers may also maintain who is designated as an approver in their absence using [IEDA].
At line 85 removed 15 lines
Approvers may designate a temporary replacement in two capacities, either a “Replacement” or an “Alternate”.
*Replacement designates relieve an approver of all approval responsibilities starting as of the “From date” and ending as of the “To date”, starting at 12am on the date specified. If these dates are left blank (null) the beginning of time and end of time are assumed respectively.
*When an alternate is defined all responsibilities are shared by the specified person and the original approver.
Both types of replacements may be specific to a certain type of approval.
Example: A manager will be away on vacation and will need to have time sheets reviewed during that time frame, so an alternate or replacement may be assigned specifically to “Time Sheets”. However, if there was a salary review due during that time, it would remain the responsibility of the original manager to approve those salaries.
When responsibility is transferred from the approver to the designate for a replacement, all approval records previously created for notification are moved from the approver to the designate when the new designate record is saved. This will cause work flow, all approver screens and Self Service splash “to do” lists to now be full for the existing approvals previously required for the approver. Any new approvals required will create new approval records for the designate and the original approver will not be notified.
Alternate designates will have a copy of the approval records created for them and the original approver will retain all existing approval records. Both the alternate and approver will receive notification of new pending approvals.
The maintenance of the approval records as described above will be limited to the specified approval types. If none are listed all approval records will be subject to this maintenance.