This page (revision-31) was last changed on 26-Nov-2021 10:22 by kparrott

This page was created on 26-Nov-2021 10:22 by KateN

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
31 26-Nov-2021 10:22 5 KB kparrott to previous
30 26-Nov-2021 10:22 5 KB kparrott to previous | to last
29 26-Nov-2021 10:22 5 KB rmorrell to previous | to last
28 26-Nov-2021 10:22 5 KB rmorrell to previous | to last
27 26-Nov-2021 10:22 5 KB JMyers to previous | to last
26 26-Nov-2021 10:22 5 KB JMyers to previous | to last
25 26-Nov-2021 10:22 5 KB RForbes to previous | to last
24 26-Nov-2021 10:22 5 KB JMyers to previous | to last
23 26-Nov-2021 10:22 5 KB JMyers to previous | to last
22 26-Nov-2021 10:22 5 KB JMyers to previous | to last
21 26-Nov-2021 10:22 4 KB JMyers to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 11 changed one line
;[Description|DESCRIPTION]:In this field, you may enter a description of the wage scale created.
;[Standing|STANDING]:This field allows you to mark scales as Frozen or Obsolete
At line 21 added 3 lines
;[Description|DESCRIPTION]:In this field, you may enter a description of the wage scale created.
At line 25 changed one line
;[Seq #|STEP_SEQUENCE]:This field will allow you to define the sequential order of the wage steps. This sequential order will be used by [{$applicationname}] to process the steps in order.
;[Seq #|STEP_SEQUENCE]:This field will allow you to define the sequential order of the wage steps. This sequential order will be used by Personality to process the steps in order.
At line 29 changed one line
;[Rate|SCALE_RATE]:This is the rate, based on the rate basis (below), defined for the step. Enter a dollar amount in this field.
;[Scale Rate|SCALE_RATE]:This is the rate, based on the rate basis (below), defined for the step. Enter a dollar amount in this field.
At line 33 changed one line
;[% of Base|PERCENTAGE_OF_BASE]:
;[% of Base|PERCENTAGE_OF_BASE]:This field indicates the percentage of the wage base. See [Percentage of Base |PERCENTAGE_OF_BASE] for a full explanation.
At line 37 changed one line
;[Cell #|CELL_NUMBER]:Cells are a specific point on the Define Rate Matrices ([ISRM]) form. You may place this cell number on several different scales and but control its rate through the matrix.
;[Cell #|CELL_NUMBER]:Cells are a specific point on the Define Rate Matrices ([ISRM]) form. You may place this cell number on several different scales and control its rate through the matrix.
At line 39 changed one line
;[Add New Step|ACT_ADD_NEW_STEP]: This action allows you to add a new step to the scale.
;[Add Step|ACT_ADD_NEW_STEP]: This action allows you to add a new step to the scale.
At line 42 changed one line
;[Step/Sequence|STEP_SEQUENCE]:These two fields will allow you to specify the step and sequence that are to be changed. Neither of these fields are accessible for the mass rate change.
;[Step|STEP_CODE]:Within this field, you will enter the actual name of the step you are creating. This name may be a numeric, alphanumeric, or descriptive value.
At line 44 changed 2 lines
;[Effective|EFFECTIVE]/[Expiry|EXPIRY]:The Effective and Expiry fields indicate the dates through which a wage step is in effect. These fields have a default entry of the 01-Jan-0001 and 31-Dec-3999. Effective and Expiry dates can only be changed through the ‘Scale Modification’ area in this screen, in the Change Date field.
%%information that this process does NOT allow a ‘trial’ run but the changes are not committed until the form is saved.%%
;[Seq #|STEP_SEQUENCE]:This field will allow you to define the sequential order of the wage steps. This sequential order will be used by Personality to process the steps in order.
At line 47 changed one line
;[Rate|SCALE_RATE]:This is the rate, based on the rate basis (below), defined for the step. Enter a dollar amount in this field.
;[Effective as of|EFFECTIVE]/[Expiry On|EXPIRY]:The Effective and Expiry fields indicate the dates through which a wage step is in effect. These fields have a default entry of the 01-Jan-0001 and 31-Dec-3999. Effective and Expiry dates can only be changed through the ‘Scale Modification’ area in this screen, in the Change Date field.
%%information This process does NOT allow a ‘trial’ run but the changes are not committed until the form is saved.%%
At line 52 added 2 lines
;[Scale Rate|SCALE_RATE]:This is the rate, based on the rate basis (below), defined for the step. Enter a dollar amount in this field.
At line 51 changed one line
;[% of Base|PERCENTAGE_OF_BASE]:
;[% of Base|PERCENTAGE_OF_BASE]:This field indicates the percentage of the wage base.
At line 55 changed one line
;[Cell #|CELL_NUMBER]:Cells are a specific point on the Define Rate Matrices ([ISRM]) form. You may place this cell number on several different scales and but control its rate through the matrix.
;[Cell #|CELL_NUMBER]:Cells are a specific point on the Define Rate Matrices ([ISRM]) form. You may place this cell number on several different scales and control its rate through the matrix.
At line 58 changed one line
You may update an entire scale within the Scale/Step form by using the [Mass Change|ACT_MASS_CHANGE] button.
You may update an entire scale within the Scale/Step form by using the [Mass Change|MSWSMC] button.
At line 60 changed one line
;[Change Date|CHANGE_DATE]:This field shows the date the change is to occur.
!Step Change
You may update an entire scale within the Scale/Step form by using the [Step Change|MSWSSC] button.
At line 62 changed one line
;[Change Reason|CHANGE_CODE]:This field shows the reason for the rate change. This field may be used in mass update programs to insert a change reason into the new records (with the new rate) that will be created.
!Modify Effective
If the effective date split is correct but the date is wrong then it may be modified, one step at a time. This can be done by pressing the [Modify Effective|MSWSMR] button.
At line 64 changed one line
;[Type|DRV_TYPE]:This field indicates the type of change to be applied.
!Delete Effective
If the effective date split is to be deleted, this can be done by pressing the [Delete Effective|MSWSMR] button.
At line 67 removed 2 lines
!Step Change
You may update an entire scale within the Scale/Step form by using the [Step Change|ACT_STEP_CHANGE] button.
At line 70 removed 2 lines
!Modify Effective Date
If the effective date split is correct but the date is wrong then it may be modified, one step at a time. This can be done by pressing the [Modify Effective|ACT_MODIFY_EFFECTIVE] button.
At line 78 changed one line
----
![Notes|Edit:Internal.ISWS]
[{InsertPage page='Internal.ISWS' default='Click to create a new notes page'}]