Review Previous Set Up#


Prior to working through the Forecasting & Costing application, it is advised to go through the following setup checklist.
  • Business Calendars (IDCL)
    • Set up all business calendars to the end of the budget period
  • Entity (IDEN)
    • The GL company must be indicated on the entity form
  • GL Segments (IDGS)
    • Ensure segments have been defined
  • Work Rules (IDWR)
    • Set up work rules with appropriate work calendars for all budgeted positions and assignments, if no calendar is specified then Monday to Friday is assumed.
    • Ensure that the status rules have been established
    • If establishing budgets in a database separate from production, create standard work rules for loaded or manually entered assignment and positions.
  • Positions (IDPS)
    • Ensure that all budgeted positions have an appropriate range, scale/step or wage
    • Ensure that the Authorized FTE is completed
    • Set up a Default FTE for positions that is less than fulltime
    • Set up positions for projected new hires
    • Ensure that the standing is set to ‘active’
    • Ensure the budget rules is set to ‘budgeted’
    • Ensure that the distribution is completed
  • Assignments (IEAS)
    • Ensure that all active employees have an appropriate range, scale/step or wage
    • Ensure that the Authorized FTE is completed
    • Ensure that the distribution is completed
    • U se the Scale Override toggle to prevent ‘Stepping’ for UFSTEP if required
  • Benefit Plans (IBPN)
    • If there are planned rate changes for benefits they should be entered as date effective changes
  • Benefit Schedules (IBSC)
  • Set up default coverages for benefit plans that will be used for VACANT positions; only fill the default coverage
  • UserCalcs (IMUC)
    • Copy all UserCalcs to be used in FC, especially BE UserCalcs
      • You must be signed in as P2K to copy UserCalcs for FC
      • All UserCalcs copied for the FC 'Product' will be prefixed by 'FC_'
      • The old UserCalc and the new one must be exactly the same after the “FC_” prefix
      • Example of a bad copy: Old UC = ’Supp Life Prem’, New UC = ’FC_Supp Life Pre’ (These are not the same after the ‘FC_’ prefix.)
      • Example of a good copy: Old UC = ’SUPPLIFEPREM’, New UC = ‘FC_SUPPLIFEPREM’
    • Change operand types EC/PC to EP/PP when used in a formula
    • Ensure all PPH database items are changed to another database item or hard coded
    • Write new Benefit UserCalcs that will be applicable for budgeting User Variables (IMVR)
    • Define new user variables that will be applicable for budgeting Wage Scales (ISWS)
    • Enter planned wage scale/step changes that will occur during the budget time frame
  • Wage Step Rules (ISRS)
    • Ensure that the Allow Wage Stepping toggle is checked in the bottom block of the ISRS screen
  • Premium Types (ISPT)
    • Define new premium types that will be applicable for budgeting
  • Premiums (ISPM)
    • Define new premiums that will be applicable for budgeting
    • If establishing budgets in a production environment, premiums must be used to create earnings for loaded or manually entered assignments and positions
  • Pay Calendars (IPCL)
    • Set up all pay period calendars to the end of the budget period
  • Pay Components (IPPC)
    • Ensure that all time pay components have a calculation method of “EV: Entered Value”
  • Processing Frequencies (IPPF)
    • Define new processing frequencies that will be applicable for budgeting, if required
  • Pay Points (IPPP)
    • Define new pay point sets for budgeting purposes.

Budget Structure#


The budget structure defines the construction of budgets and budget areas, plans, assumptions and rules.
  • Budget Setup
  • Wage Stepping for Budget Seats
  • Create Actual Scenarios and Seats (UFACT)


Establish Budgets#



Analyze Financial Information#