This page (revision-9) was last changed on 26-Nov-2021 10:22 by lurtan

This page was created on 26-Nov-2021 10:22 by JEscott

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
9 26-Nov-2021 10:22 2 KB lurtan to previous
8 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
7 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
6 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
5 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
4 26-Nov-2021 10:22 2 KB JEscott to previous | to last
3 26-Nov-2021 10:22 2 KB JEscott to previous | to last
2 26-Nov-2021 10:22 1 KB JEscott to previous | to last T
1 26-Nov-2021 10:22 898 bytes JEscott to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 3 added 3 lines
!!Processing Information
UTTP builds the scheduled shifts, and at the same time the time sheet details are created.
At line 7 changed one line
The Work Rule for any employees assigned as owners to a team post must have a Work rule that has a Generation Destination of TS-Shift and, at a minimum, the Default Time Code Time Rule set up.
The Work Rule for any employees assigned as owners to a team post must have a Work rule that has a [Generation Destination|TIME_GENERATION_DESTINATION] of TS-Shift and, at a minimum, the [Default Time Code|TR_DFLT_TIME_CODE] Time Rule set up.
At line 15 added 26 lines
If performance is an issue with UTTP, the function may be configured to use multiple processing threads to speed up performance. For more information on this please see the page titled [Multiple Processing Threads|MULTIPLE PROCESSING THREADS].
UEGTS and UTTP can be run in either order.
UTTP will create a time sheet for the employee if the period being run for includes the current pay period and a time sheet does not exist. UTTP will not update a time sheet details once it has been created in any successive run. You would need to use UEGTS to update a time sheet.
----
!!Report Parameters & Filters
||Report Parameters||
|From Date| Mandatory, Date, LOV Available. This is the first date from which the report is to process information.
|To Date| Mandatory, Date, LOV Available. This is the last date from which the report is to process information.
|Exception Level| Mandatory, LOV available, <Exception Only>. This field indicates the exception level (report messages) required.
||Report Filters||
|Work Division| Mandatory, Match, Multiple Selection, LOV Available, <ALL>. This field limits the report to the work division(s) specified.
|Work Area |Mandatory, Match, Multiple Selection, LOV Available, <ALL>. This field limits the report to the work area(s) specified.
|Work Station| Mandatory, Match, Multiple Selection, LOV Available, <ALL>. This field limits the report to the work station(s) specified.
|Work Team| Mandatory, Match, Multiple Selection, LOV Available, <ALL>. This field limits the report to the work team(s) specified
----
![Notes|Edit:Internal.UTTP]
[{InsertPage page='Internal.UTTP' default='Click to create a new notes page'}]