This page (revision-9) was last changed on 26-Nov-2021 10:22 by lurtan

This page was created on 26-Nov-2021 10:22 by JEscott

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
9 26-Nov-2021 10:22 2 KB lurtan to previous
8 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
7 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
6 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
5 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
4 26-Nov-2021 10:22 2 KB JEscott to previous | to last
3 26-Nov-2021 10:22 2 KB JEscott to previous | to last
2 26-Nov-2021 10:22 1 KB JEscott to previous | to last T
1 26-Nov-2021 10:22 898 bytes JEscott to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 4 removed 2 lines
UTTP builds the scheduled shifts, and at the same time the time sheet details are created.
At line 18 removed one line
UEGTS and UTTP can be run in either order.
At line 20 removed 2 lines
UTTP will create a time sheet for the employee if the period being run for includes the current pay period and a time sheet does not exist. UTTP will not update a time sheet details once it has been created in any successive run. You would need to use UEGTS to update a time sheet.