This page (revision-2) was last changed on 26-Nov-2021 10:22 by JMyers

This page was created on 26-Nov-2021 10:22 by JMyers

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
2 26-Nov-2021 10:22 396 bytes JMyers to previous
1 26-Nov-2021 10:22 323 bytes JMyers to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 changed 6 lines
WORK_DIVISION_CODE is a 16-character alphanumeric optional field. This field associates a work division to the assignment, for use with the Time Scheduling module and workers. If using the Time Scheduling module, this field should be filled in.
----
![Notes|Edit:Internal.WORK_DIVISION_CODE]
[{InsertPage page='Internal.WORK_DIVISION_CODE' default='Click to create a new notes page'}]
WORK_DIVISION_CODE is a 16-character alphanumeric optional field you must either manually enter or select a value from the LOV(F9) provided. This field associates a work division to the assignment, for use with the Time Scheduling module and workers. If using the Time Scheduling module, this field should be filled in.