This page (revision-34) was last changed on 26-Nov-2021 10:22 by kparrott

This page was created on 26-Nov-2021 10:22 by jlawler

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
34 26-Nov-2021 10:22 23 KB kparrott to previous
33 26-Nov-2021 10:22 23 KB kparrott to previous | to last
32 26-Nov-2021 10:22 23 KB jlawler to previous | to last
31 26-Nov-2021 10:22 22 KB jlawler to previous | to last
30 26-Nov-2021 10:22 22 KB jlawler to previous | to last
29 26-Nov-2021 10:22 21 KB jlawler to previous | to last
28 26-Nov-2021 10:22 19 KB jlawler to previous | to last
27 26-Nov-2021 10:22 17 KB jlawler to previous | to last
26 26-Nov-2021 10:22 16 KB jlawler to previous | to last
25 26-Nov-2021 10:22 16 KB jlawler to previous | to last
24 26-Nov-2021 10:22 15 KB jlawler to previous | to last
23 26-Nov-2021 10:22 13 KB jlawler to previous | to last
22 26-Nov-2021 10:22 13 KB jlawler to previous | to last
21 26-Nov-2021 10:22 11 KB jlawler to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 188 changed one line
!Scenario
!Scenario 8
At line 190 added one line
''This is the case where the employee only works part-time (FTE<1). The employee is to be paid for the number of hours on their assignment in the Hrs/Day field. Their schedule for the week is two -'8' hour days and one - '4' hour day. The holiday falls on teh 1st day, so the employee should only get their maximum of 4 hours for the holiday, not the 8 hours).''
At line 192 added one line
;Setup on IDHC:Hours Per Day = Null\\OT Factor=Null\\Holiday Time code=HOLBANK(IDTC __Adjust Scheduled Time__ toggle is __ON__) \\Worked Time Code = HOLWORK\\Day Off Time Code = Null
At line 194 added 2 lines
;Setup on IDWR:Holidays Use Sched Hrs=OFF
;Results:4 Hours REG (8-4=4)\\8 Hours HOLBANK(Holiday Bank)\\8 Hours HOLWORK(Replacement for Regular Time)
At line 197 added one line
__Note:__ The HOLBANK time is taken from the employee's assignment HRS/DAY field to cap the number of hours per day the employee is paid for.
At line 199 added 2 lines
!Scenario 9
''This is the case where the employee only works part-time (FTE<1). The employee is to be paid for the number of hours on their assignment in the Hrs/Day field. Their schedule for the week is two - '8' hour days and one- '4' hour day. The holiday falls on the 1st day, so the employee should only get their maximum of 4 hours for the holiday *not 8).
At line 202 added one line
;Setup on IDHC:Hours Per Day = Null\\OT Factor=Null\\Holiday Time code=HOLBANK(IDTC __Adjust Scheduled Time__ toggle is __OFF__) \\Worked Time Code = HOLWORK\\Day Off Time Code = Null
At line 204 added 14 lines
;Setup on IDWR:Holidays Use Sched Hrs=OFF
;Results:0 Hours REG\\4 Hours HOLBANK (Holiday Leave)\\8 hOURS holwork(Replacement for Regular Time)