This page (revision-34) was last changed on 26-Nov-2021 10:22 by kparrott

This page was created on 26-Nov-2021 10:22 by jlawler

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
34 26-Nov-2021 10:22 23 KB kparrott to previous
33 26-Nov-2021 10:22 23 KB kparrott to previous | to last
32 26-Nov-2021 10:22 23 KB jlawler to previous | to last
31 26-Nov-2021 10:22 22 KB jlawler to previous | to last
30 26-Nov-2021 10:22 22 KB jlawler to previous | to last
29 26-Nov-2021 10:22 21 KB jlawler to previous | to last
28 26-Nov-2021 10:22 19 KB jlawler to previous | to last
27 26-Nov-2021 10:22 17 KB jlawler to previous | to last
26 26-Nov-2021 10:22 16 KB jlawler to previous | to last
25 26-Nov-2021 10:22 16 KB jlawler to previous | to last
24 26-Nov-2021 10:22 15 KB jlawler to previous | to last
23 26-Nov-2021 10:22 13 KB jlawler to previous | to last
22 26-Nov-2021 10:22 13 KB jlawler to previous | to last
21 26-Nov-2021 10:22 11 KB jlawler to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 111 added one line
The following table show how work time is generated using the different methods available in the work rule (IDWR) via the Obtain Details From option in the Status rules tab.
At line 113 added 7 lines
There are two processes in charge of determingin the Work Time Code:
# Scheduled Shifts(TSH)
# Time Sheet Entries (PTSE)
||Obtain Details From||Type||Process in Charge in Generating Work time||Process in Charge ||Aplies Work Holiday Time Code