This page (revision-24) was last changed on 26-Nov-2021 10:22 by kparrott

This page was created on 26-Nov-2021 10:22 by JMyers

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
24 26-Nov-2021 10:22 26 KB kparrott to previous
23 26-Nov-2021 10:22 25 KB rforbes to previous | to last
22 26-Nov-2021 10:22 25 KB jmyers to previous | to last
21 26-Nov-2021 10:22 26 KB JMyers to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 4 changed one line
P2K provides for the ability to compute an hourly rate for salaried employees so that when hours are entered into the system from any of the various sources, the rate of pay is computed (Formulae explained in this document) in such a way that the proper wages are generated.
P2K provides for the ability to compute an hourly rate for salaried employees so that when hours are entered into the system from any of the various sources, the rate of pay is computed (Formula explained in this document) in such a way that the proper wages are generated.
At line 17 changed one line
A new rate routine to calculate “Variable Rate”, and ‘Variable Time” method is created. See “Business Case Examples” later in this document.
A new rate routine to calculate “Variable Rate”, and ‘Variable Time” method is created. See “Business Case Examples” later in this document.
At line 20 added one line
At line 22 added one line
At line 24 added one line
At line 26 added one line
At line 28 added one line
At line 30 added one line
At line 32 added one line
At line 35 added one line
At line 30 changed 3 lines
Pay Component Configuration
!!Pay Component Configuration
At line 35 changed 4 lines
Scheduled Employees
!!Scheduled Employees
At line 44 added one line
At line 46 added one line
At line 43 changed 4 lines
Variable Rate Hours
!!Variable Rate Hours
At line 51 added one line
At line 53 added one line
At line 50 changed one line
Example:
!Example:
At line 54 changed one line
Example:
!Example:
At line 60 changed 2 lines
Variable Rate (Element)
!!Variable Rate (Element)
At line 69 added one line