Identify Station Post Requirements (DTSR)#

Event Scheduling Overview#

Event Sites#

Event Sites are part of Event Scheduling. Event Sites can be defined using the ITES screen
  • An Event Site represents a set of Station Requirements for a period of time in a given Work Division, Area or Station
  • Event Scheduling should be used when
    • There is not a repeating schedule in the long run
    • Station requirements are constantly changing for a given schedule
  • Event Site status can be used to freeze the requirements. A frozen event site will not allow
    • Station Requirements to be changed
    • Scheduled Shifts worker assignments to be changed

DTSR Screen#

Station Requirements#

  • Record Station Post Requirement for a given Station Post in a Shift on a specific Date
  • For each Station Post Requirement a Scheduled Shift will be created. Decreasing the Station Post Requirement will cause Scheduled Shifts to be removed unless they have all been filled with Workers
  • Event Scheduling Work Stations do not need Work Teams to be defined
  • Event Scheduling Station Posts should not need to have Team Posts associated to them
  • Cannot be created for dates outside of the Event Site Start/End Dates
  • Has derived fields that let the user know the number of fillled Scheduled Shifts as well as the number of Vacant Scheduled Shifts