This page (revision-29) was last changed on 26-Nov-2021 10:22 by kparrott

This page was created on 26-Nov-2021 10:22 by JMyers

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
29 26-Nov-2021 10:22 9 KB kparrott to previous
28 26-Nov-2021 10:22 9 KB kparrott to previous | to last
27 26-Nov-2021 10:22 9 KB kparrott to previous | to last
26 26-Nov-2021 10:22 9 KB kparrott to previous | to last
25 26-Nov-2021 10:22 9 KB kparrott to previous | to last
24 26-Nov-2021 10:22 9 KB JMyers to previous | to last
23 26-Nov-2021 10:22 9 KB JMyers to previous | to last
22 26-Nov-2021 10:22 9 KB JMyers to previous | to last
21 26-Nov-2021 10:22 9 KB JMyers to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 4 added one line
----
At line 16 changed 2 lines
#Ensure that the employee is associated to a manager that has an email address indicated on their [IEAS] record. This is required to issue the email to the manager gets sent.
#Ensure that the employee is associated to a manager that has an email address indicated on their [IEAS] record. This is required to issue the email to the manager gets sent.\\ \\
----
At line 34 changed 2 lines
This figure reflects the set up required to have the system generate the [RBBS] report.
This figure reflects the set up required to have the system generate the [RBBS] report. \\ \\
----
At line 37 removed one line
At line 94 changed one line
The figure above displays the variables required for this UserCalc.
The figure above displays the variables required for this UserCalc.\\ \\
----
!!Sample 4 - Update the Job Seniority Date Field
!Goal
To automatically adjust the Job Seniority Date when the employee returns to work after being on leave.
!Notes
In order for the UserCalc to work, the employee must have their current employment status set to "LEAVE".
!Logistics
The user will go into the [IEAS] screen and change the status from LEAVE to ACTIVE. The system will update the Job Seniority Date field to the Effective Date. The system will also blank out the leave date and leave reason fields.
!Procedure
#Go into [IEAS] for an employee. Ensure that the record you are using is for an employee that is on LEAVE.
#Change the Employment Status field from LEAVE to ACTIVE.
#Cut an effective record and save.\\ \\\
[wf_9-11.jpg] \\ \\
The figure above displays the variables required for this UserCalc.\\ \\
----