This page (revision-6) was last changed on 26-Nov-2021 10:22 by Lilia Urtan

This page was created on 26-Nov-2021 10:22 by mmcfarland

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
6 26-Nov-2021 10:22 4 KB Lilia Urtan to previous
5 26-Nov-2021 10:22 4 KB Lilia Urtan to previous | to last
4 26-Nov-2021 10:22 4 KB lurtan to previous | to last
3 26-Nov-2021 10:22 4 KB lurtan to previous | to last
2 26-Nov-2021 10:22 4 KB lurtan to previous | to last
1 26-Nov-2021 10:22 62 bytes mmcfarland to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 8 changed 3 lines
* [IDWR] Status Rules tab - Split Options: Department&Employment, Department, Employment Status
* UEGTSSR Report Parameter 'Fiscal Split' (done by [UEGTS] as well)
%%warning Important: 'PP or WK Start' & 'PP or WK End' should be accurate otherwise we may end up with unexpected results.
* [IDWR] Status Rules tab – Split Options: Department&Employment, Department, Employment Status
* UEGTSSR – Report Parameter Fiscal Split (done by [UEGTS] as well)
%%warning Important: “PP or WK Start” & ” PP or WK End” should be accurate otherwise we may end up with unexpected results.
At line 17 changed 2 lines
* An employee has a timesheet by Employment and the request is by Assignment (or vice versa)
* There is more than one open timesheet in projected timesheet time frame
* An employee has a time sheets by Employment and the request is by Assignment (or vice versa)
* There is more than one open Timesheet in projected time sheet time frame
At line 24 changed 6 lines
|PP or WK Start|Mandatory, Date, LOV available\\ This is the first date of Pay Period or Week which the report is generating time for. %%warning It must be the exact PP or Week (for weekly timesheet) start date%%
|PP or WK End|Mandatory, Date, LOV available\\ This is the last date of Pay Period or Week which the report is generating time for. %%warning It must be the exact PP or Week (for weekly timesheet) end date%%
|By Assignment |Optional, Yes or No\\Users can specify if they want to generate separate timesheets for each of the employee's assignments.
|Weekly (BW)| Optional, Yes or No\\If Yes is selected, a timesheet will be generated for the week selected in the PP or WK Start/End parameters. If No is selected, the timesheet will be generated for the entire pay period.
|All PP Weekly TS (BW)| Optional, Yes or No\\This parameter will generate timesheets for the entire pay period that begins with the date selected in the PP or WK Start/End parameters. If Yes is selected in the Weekly parameter and Yes is selected for this parameter the timesheets will be generated on a weekly basis for the entire pay period. For example, in a biweekly period two timesheets will be generated (one for each week). If No or null is selected in the Weekly parameter and Yes is selected in this parameter one timesheet will be generated for the entire pay period.
|Weekly (SM/MO)| Optional, Yes or No\\This parameter provides an ability to generate weekly timesheet by first week day for the semi-monthly or monthly payroll
|PP or WK Start|Mandatory, Date, LOV available\\ This is the first date of Pay Period or Week which the report is generating time for. %%warning It must be the exact PP or Week start date%%
|PP or WK End|Mandatory, Date, LOV available\\ This is the last date of Pay Period or Week which the report is generating time for. %%warning It must be the exact PP or Week end date%%
|By Assignment |Optional, Yes or No\\Users can specify if they want to generate separate timesheets for each of the employees’ assignments.
|Weekly| Optional, Yes or No\\If Yes is selected, a timesheet will be generated for the week selected in the PP or WK Start/End parameters. If No is selected, the timesheet will be generated for the entire pay period.
|All WklyTS in PP| Optional, Yes or No\\This parameter will generate timesheets for the entire pay period that begins with the date selected in the PP or WK Start/End parameters. If Yes is selected in the Weekly parameter and Yes is selected for this parameter the timesheets will be generated on a weekly basis for the entire pay period. For example, in a biweekly period two timesheets will be generated (one for each week). If No or null is selected in the Weekly parameter and Yes is selected in this parameter one timesheet will be generated for the entire pay period.