This page (revision-4) was last changed on 26-Nov-2021 10:22 by RForbes

This page was created on 26-Nov-2021 10:22 by KateN

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
4 26-Nov-2021 10:22 1 KB RForbes to previous
3 26-Nov-2021 10:22 1 KB RForbes to previous | to last
2 26-Nov-2021 10:22 1 KB RForbes to previous | to last
1 26-Nov-2021 10:22 1 KB KateN to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 12 changed 4 lines
|00|Use Date from UserCalc|Specify the name of the <User Calc> on the\\ component.\\The usercalc must be of the type 'Function',\\with a return value of the type 'Date'. The user-\\calc must use the RET operator to return a date \\value.\\This value is interpreted by the component\\ as the date on which to determine the wage rate.|[B0300|BC-B0300]|[B0320]
|01*|Use Current Date|This value uses the processing date as the date\\on which to determine the wage rate.|[B0300|BC-B0300]|[B0320]
|02|Use Specified Date|Specify the date in the <BC Value> on the component.\\Uses the value entered as DD-Mon-YYYY as\\the date on which to determine the wage rate.\\(e.g. 01-May-1977)|[B0300|BC-B0300]|[B0320]
|03|Use Specified DD-Mon in\\PP End Year|Specify the recurring day and month (DD-Mon)\\in the <BC Value> in the component.\\Use the day and month (01-Jan) specified plus\\the year of the Pay Period End date (21-Mar-\\2000) to determine the wage rate. (e.g. 01-Jan-\\2000)|[B0300|BC-B0300]|[B0320]
|00|Use Date from UserCalc|Specify the name of the <User Calc> on the component. The usercalc must be of the type 'Function', with a return value of the type 'Date'. The usercalc must use the RET operator to return a date value. This value is interpreted by the component as the date on which to determine the wage rate.|[B0300|BC-B0300]|[B0320]
|01*|Use Current Date|This value uses the processing date as the date on which to determine the wage rate.|[B0300|BC-B0300]|[B0320|BC-B0320]
|02|Use Specified Date|Specify the date in the <BC Value> on the component.\\Uses the value entered as DD-Mon-YYYY asthe date on which to determine the wage rate.\\(e.g. 01-May-1977)|[B0300|BC-B0300]|[B0320]
|03|Use Specified DD-Mon in PP End Year|Specify the recurring day and month (DD-Mon) in the <BC Value> in the component. Use the day and month (01-Jan) specified plus the year of the Pay Period End date (21-Mar-2000) to determine the wage rate. (e.g. 01-Jan-2000)|[B0300|BC-B0300]|[B0320|BC-B0320]