REPORT SCHEDULING
Back to current versionRestore this version

Reports can be run immediately or scheduled to run at a later day/time. To schedule a report to run at a later date, you need to provide information on the Run Options tab of the Report Launch form.

Run Options Tab#


Report Scheduling - Run When#

These Report Scheduling Run When options may be used to schedule the process to run at a designated time. If there are no options specified, the process will run immediately.
Schedule Start Date
This field specifies the date that the process will run.
Run Start Time
This field specifies the time the process will run (on the 24hr clock).

Report Scheduling - Repeat Options#

These Report Scheduling Repeat Options may be used to automatically repeat the report or update process on a designated frequency. If there are no options specified, the process will run only once.
Frequency
This field specifies how often the process will run. Each run will use the same parameters. e.g. Hourly, Daily, Weekly, Monthly, or Every n.
Frequency Amount
This field specifies the interval of time between runs if the Frequency is “Every”. It is expressed in the time basis of the Frequency Option. e.g. a value of 2 with a basis of ‘Days’ means ‘Every 2 Days’
Frequency Option
This field specifies the time basis of the Frequency Amount. e.g. Minute(s), Day(s), Hour(s), Week(s), Month(s), etc.
Day Repeat
This field specifies which Weekday of the month the process should be run on. e.g. First, Second, Third, Fourth, Fifth Day, etc.
Weekdays
This field identifies which day of the week the process should run on. e.g. Mon, Tues, Wed, etc.
Schedule Expiry Date
This field specifies the date that the process will stop running.

Run Report#

Once you have specified all of your parameters, you are ready to execute the report or update process. To launch the process, click the Run Report button at the top of the parameter form. If there are no scheduling options specified, the report starts the execution immediately on the report server.
Where is it controlled

How does the scheduling work – not how to schedule something.

How does it get repeated

A new MEX is created with the same parameters, changing any dates that have relative date offsets defined, for the next scheduled time THEN the existing execution runs.

How do we stop it/control it

Is it just deleting records or changing status of records in MEX?


Notes #

Click to create a new notes page