BM - Beginning of Month Beginning of Month (BM) will return the 1st day of the month of the date found in Operand 3. Statement: Find the 1st day of the month that the employee was hired and store it into the Variable 1st of Hire Month.
Line | CMD | OT | Operand 1 | OPER | OT | Operand2 | OT | Operand3 | If Goto | Else GoTo |
---|
In the example above, if an employee was originally hired on May 17, 1979, the value returned to 1st of Hire Month would be May 1, 1979. As with BD, the BM result may also be changed by a value in Operand 3. Refer to BD in section 6.5.2. For possible Operand 3 values.
Screen captures are meant to be indicative of the concept being presented and may not reflect the current screen design.
If you have any comments or questions please email the Wiki Editor
All content © High Line Corporation