This page (revision-4) was last changed on 26-Nov-2021 10:22 by RForbes

This page was created on 26-Nov-2021 10:22 by JMyers

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
4 26-Nov-2021 10:22 300 bytes RForbes to previous
3 26-Nov-2021 10:22 370 bytes RForbes to previous | to last
2 26-Nov-2021 10:22 369 bytes RForbes to previous | to last WADE_PROGRESSION_DATE ==> WAGE_PROGRESSION_DATE
1 26-Nov-2021 10:22 369 bytes JMyers to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 changed one line
WADE_PROGRESSION_DATE is an optional field. If the assignment’s wage is to increase on a specific date, that date is indicated in this field.
WADGE_PROGRESSION_DATE is an optional field. If the assignment’s wage is to increase on a specific date, that date is indicated in this field.