This page (revision-23) was last changed on 26-Nov-2021 10:22 by mmcfarland

This page was created on 26-Nov-2021 10:22 by JMyers

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
23 26-Nov-2021 10:22 3 KB mmcfarland to previous
22 26-Nov-2021 10:22 3 KB mmcfarland to previous | to last
21 26-Nov-2021 10:22 3 KB mmcfarland to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 3 changed one line
This is a helper time rule which is used to determine the beginning of the work week depending on the minimum number of days off before the first day of work.
This is a helper time rule to determine the beginning of the work week, depending on the minimum number of days off before the first day of work.
At line 5 changed one line
This time rule should be used in conjunction with the following additional time rules:
This time rule should be used in conjunction with the following time rules:
At line 9 added one line
At line 10 changed 2 lines
[Band |QUALIFYING_BAND]
*One band is supported
* [Band |QUALIFYING_BAND]: only one band is supported
At line 13 changed 2 lines
[Frequency|FREQUENCY]
*predefined as ‘Never’
* Frequency predefined as Never
At line 17 changed one line
* This is a collection of time codes that help identify the work week. Any time considered "Work Time" should be included in this time code set. If a time code is entered that is not found in this time code set, the system will treat that time code as a "Day Off".
* This is a collection of time codes that help identify the work week. Any time considered "Work Time" should be included in the Target Time Code Set field. If a time code is entered that is not found in this time code set, the system will treat that time code as a "Day Off".
At line 19 changed one line
*Leave time codes can be included in the target time code set. This is to prevent unscheduled days off like "Vacation" or "Sick" from recalculating the start of the work week (ie, if the time rule value contained '3' and "Sick" time code was not included in the target time code set, if the employee was sick for 3 days mid period, this would result in the time rule recalculating the beginning of the work week to the incorrect day).
*Leave time codes can be included in the Target Time Code Set field. This will prevent unscheduled days off like Vacation or Sick time from recalculating the start of the work week
Example: if the time rule value contained '3' and "Sick" time code was not included in the target time code set, if the employee was sick for 3 days mid period, this would result in the time rule recalculating the beginning of the work week to the incorrect day).