This page (revision-2) was last changed on 26-Nov-2021 10:22 by mmcfarland

This page was created on 26-Nov-2021 10:22 by mmcfarland

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
2 26-Nov-2021 10:22 1 KB mmcfarland to previous
1 26-Nov-2021 10:22 1 KB mmcfarland to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 changed one line
!!!VAR WRK VS PRJ – Variance Between Work and Projected Times
!!!VAR WRK VS PRJ – Variance between Work and Projected Times
At line 3 changed one line
This time rule will calculate the variance between work and projected time. It works in conjunction with the VARIANCE DTCS and OT PP BY DY VAR helper time rules to determine the pay period overtime. This rule was created to calculate the OT PERIOD based on the work hours for a period, such as a Month.
This time rule will calculate the variance between work and projected time. It works in conjunction with the VARIANCE DTCS and OT PP BY DY VAR helper time rules to determine the pay period overtime. This rule was created to calculate the OT PERIOD based on work hours for a period, such as a Month.
At line 19 changed one line
[1] The defined Time Code should be an unpaid time code as this is only an indicator of the variance.
[1] The defined time code should be an unpaid time code as this is only an indicator of the variance.