This page (revision-3) was last changed on 26-Nov-2021 10:22 by mmcfarland

This page was created on 26-Nov-2021 10:22 by mmcfarland

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
3 26-Nov-2021 10:22 1004 bytes mmcfarland to previous
2 26-Nov-2021 10:22 1006 bytes mmcfarland to previous | to last
1 26-Nov-2021 10:22 1 KB mmcfarland to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 3 changed one line
This time rule will calculate the variance between work and projected time. It works in conjunction with the VARIANCE DTCS and OT PP BY DY VAR helper time rules to determine the pay period overtime. This rule was created to calculate the OT PERIOD based on work hours for a period, such as a Month.
This is a helper time rule for the OT PP BY DY VAR time rule to indicate, under each time code, the variance between work and projected time is registered by the VAR WRK VS PRJ time rule.
At line 5 removed one line