This page (revision-10) was last changed on 26-Nov-2021 10:22 by Meg McFarland

This page was created on 26-Nov-2021 10:22 by Meg McFarland

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
10 26-Nov-2021 10:22 4 KB Meg McFarland to previous
9 26-Nov-2021 10:22 4 KB Karen Parrott to previous | to last
8 26-Nov-2021 10:22 4 KB Karen Parrott to previous | to last
7 26-Nov-2021 10:22 4 KB Karen Parrott to previous | to last
6 26-Nov-2021 10:22 4 KB Karen Parrott to previous | to last
5 26-Nov-2021 10:22 4 KB Karen Parrott to previous | to last
4 26-Nov-2021 10:22 4 KB Karen Parrott to previous | to last
3 26-Nov-2021 10:22 4 KB Karen Parrott to previous | to last
2 26-Nov-2021 10:22 4 KB Meg McFarland to previous | to last
1 26-Nov-2021 10:22 4 KB Meg McFarland to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 3 changed one line
The To Be Balanced time rule allows an employee to use excess hours worked on day one to top up the hours for another day. This is also referred to as flexible schedules. \\ \\
The To Be Balanced time rule allows an employee to use excess hours worked on day one to top up the hours for another day. This is also referred to as flexible schedules. \\
At line 14 changed 2 lines
Total time worked on Monday: 10 hours on Timesheet \\ \\
Total time worked on Monday: 10 hours on Timesheet
\\
At line 20 changed one line
\\ \\
\\
At line 67 changed one line
This is a helper time rule that holds the information needed for ACT_SUBMIT_VALIDATE_WORK_WEEK, where the target/apply time code set holds the time code that need to be balanced (Target vs Apply)
Works with the new “TO BE BALANCED” time rule. This is a helper time rule that holds the information needed for ACT_SUBMIT_VALIDATE_WORK_WEEK, where the target/apply time code set holds the time code that need to be balanced (Target vs Apply)
At line 80 changed one line
| | | |TO BE BALANCED|No|No|No|No|No|No|No|Required|Required|No
| | | | |No|No|No|No|No|No|No|No|No|Required