This page (revision-12) was last changed on 26-Nov-2021 10:22 by mmcfarland

This page was created on 26-Nov-2021 10:22 by JMyers

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
12 26-Nov-2021 10:22 2 KB mmcfarland to previous
11 26-Nov-2021 10:22 2 KB mmcfarland to previous | to last
10 26-Nov-2021 10:22 2 KB mmcfarland to previous | to last
9 26-Nov-2021 10:22 2 KB mmcfarland to previous | to last
8 26-Nov-2021 10:22 2 KB mmcfarland to previous | to last
7 26-Nov-2021 10:22 2 KB mmcfarland to previous | to last
6 26-Nov-2021 10:22 2 KB mmcfarland to previous | to last
5 26-Nov-2021 10:22 2 KB JEscott to previous | to last
4 26-Nov-2021 10:22 2 KB JEscott to previous | to last
3 26-Nov-2021 10:22 2 KB JEscott to previous | to last
2 26-Nov-2021 10:22 2 KB JMyers to previous | to last
1 26-Nov-2021 10:22 1 KB JMyers to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 7 changed one line
* With this set up, users will also see the meal time once the time sheet has been brought into pay transactions.
* With this set up, users will also see the meal time once the time sheet has been moved into pay transactions.
At line 9 removed 2 lines
* If the Meal time code is defined in the Target Time Code Set, the meal time will be considered and calculated as the hours worked since the shift start.
* If the Meal time code is NOT defined in Target Time Code Set, the time will NOT be considered and calculated as the hours worked since the shift start.
At line 21 changed one line
| |Every Shift|1110| |Minimum # of hours worked since shift start|No|No|Maximum # of hours to top up|Allowed [1]|Allowed|Allowed|Allowed| |Add
| |Every Shift|1110| |Minimum # of hours worked since shift start|No|No|Maximum # of hours to top up|Allowed [1]|Allowed|Allowed|Allowed [2]| |Add
At line 24 changed one line
[1] The defined day of the week is taken into consideration, or if this field is null, it will be applied to all days.
[1] The defined day of the week is taken into consideration, or if this field is null, it will be applied to all days. \\
[2] If the Meal time code is defined in the Target Time Code Set, the meal time will be considered and calculated as the hours worked since the shift start. If the Meal time code is NOT defined in Target Time Code Set, the time will NOT be considered and calculated as the hours worked since the shift start.
At line 25 added one line