This page (revision-2) was last changed on 26-Nov-2021 10:22 by mmcfarland

This page was created on 26-Nov-2021 10:22 by mmcfarland

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
2 26-Nov-2021 10:22 1 KB mmcfarland to previous
1 26-Nov-2021 10:22 1 KB mmcfarland to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 5 changed 2 lines
The day off is determined by:
* The work day type of ‘Day Off’ on the Hours/Shift Work calendar
The day off is determined based on:
* The work day type of ‘Day Off’ on the hours/shift work calendar
At line 14 changed one line
* If this helper rule is defined, the time code of the day off will be applied only on the time frame defined by this rule. Example: 6 to +6
* If this helper rule is defined, the time code of the day off will only be applied on the specific time frame defined by this rule. Example: 6 to +6