This page (revision-21) was last changed on 26-Nov-2021 10:22 by mmcfarland

This page was created on 26-Nov-2021 10:22 by JMyers

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
21 26-Nov-2021 10:22 2 KB mmcfarland to previous

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 5 changed one line
Calculates Weekly OT based on determining the Hitch start, from the [HITCH|TR_HITCH] time rule, then looking back the number of days, defined in the Value, then looking forward 7 days.
Calculates Weekly OT based on determining the Hitch start, from the [HITCH|TR_HITCH] time rule, then looking back the number of days defined in the Value, then looking forward 7 days.
At line 9 changed one line
A client could use [OT WORK WEEK|TR_OT_WORKWEEK] and [WK START OFF DAY|TR_WK_START_OFF_DAY] instead of [HITCH|TR_HITCH] and [OT HITCH WEEK|TR_OT_HITCH_WEEK] as they behave in similar manners.
Organizations can use [OT WORK WEEK|TR_OT_WORKWEEK] and [WK START OFF DAY|TR_WK_START_OFF_DAY] instead of [HITCH|TR_HITCH] and [OT HITCH WEEK|TR_OT_HITCH_WEEK] as they behave in similar manners.
At line 12 changed one line
*The time rule’s role is to determine the start of the week and hitch start date for OT HITCH WEEK and [OT CONSC NO SCH|TR_OT_CONSC_NO_SCH] time rules.
*The time rule’s role is to determine the start of the week and Hitch start date for OT HITCH WEEK and [OT CONSC NO SCH|TR_OT_CONSC_NO_SCH] time rules.