This page (revision-3) was last changed on 26-Nov-2021 10:22 by mmcfarland

This page was created on 26-Nov-2021 10:22 by mmcfarland

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
3 26-Nov-2021 10:22 2 KB mmcfarland to previous
2 26-Nov-2021 10:22 2 KB mmcfarland to previous | to last
1 26-Nov-2021 10:22 2 KB mmcfarland to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 18 changed 2 lines
* Standard hours per week can be defined in the Value field, or the system will use the Assignment standard hours per week.
* Since the annual can end in the middle of the week, the first/last annual week is defined by the ANNALS_1_WK_STD and ANNALS_52_WK_STD rules. If they rules are not defined, the system will use the work time projector.
* Standard hours per week should be defined in the Value field. If not defined, the system will use the Assignment standard hours per week.
* Since the annual can end in the middle of the week, the first/last annual week is defined by the ANNALS_1_WK_STD and ANNALS_52_WK_STD rules. If these rules are not defined, the system will use the work time projector.