This page (revision-6) was last changed on 26-Nov-2021 10:22 by JEscott

This page was created on 26-Nov-2021 10:22 by JEscott

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
6 26-Nov-2021 10:22 3 KB JEscott to previous
5 26-Nov-2021 10:22 2 KB JEscott to previous | to last
4 26-Nov-2021 10:22 1 KB JEscott to previous | to last
3 26-Nov-2021 10:22 1 KB JEscott to previous | to last
2 26-Nov-2021 10:22 871 bytes JEscott to previous | to last
1 26-Nov-2021 10:22 780 bytes JEscott to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 removed 2 lines
[{TableOfContents }]
!!!MULTI STEP APPROVAL PROCESS FOR OPEN ENROLLMENT
At line 42 changed 13 lines
[{Image src='OE APPROVAL REQ WC.JPG' width='500' link='attach/OE APPROVAL REQ WC.JPG'}]
The where clause above uses a derived column, DRV_APPROVAL_REQUIRED, to capture plans (if any) within the open enrollment have the Approval Required lexicon in [IBPN] set to Approval Required.
If one plan within the employee’s open enrollment requires approval, this will call the above approval process.
This is the final approval step, once the specified user has approved this step the EE Open Enroll Stage will become approved and the Benefit Administrator can then process the employee’s open enrollment.
----
![Notes|Edit:Internal.MULTI+STEP+OE+APPROVAL]
[{InsertPage page='Internal.MULTI+STEP+OE+APPROVAL' default='Click to create a new notes page'}]
[{Image src='OE APR CHGS WC.JPG' width='500' link='attach/OE APR CHGS WC.JPG'}]