This page (revision-6) was last changed on 26-Nov-2021 10:22 by rthiruppathy

This page was created on 26-Nov-2021 10:22 by rthiruppathy

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
6 26-Nov-2021 10:22 2 KB rthiruppathy to previous
5 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
4 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
3 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
2 26-Nov-2021 10:22 2 KB rthiruppathy to previous | to last
1 26-Nov-2021 10:22 534 bytes rthiruppathy to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 11 changed one line
Example: The employee’s regular dental deduction is $35.00 for this pay period. Employee owes an additional $10 for this pay.
Example: The employee’s regular dental deduction is $35.00 for a pay period. Employee owes an additional $10 for the same pay.
At line 19 changed one line
__Set Up Required__\\
!Set Up Required\\
At line 27 changed 2 lines
''Action: Accumulate'' – this will accumulate the adjustment (+ or -) to the benefit calculated amount.
Pay Point – this must be after the pay point where the benefit plans are calculated. If you have the benefit plans being calculated at pay point 30, the pay component pay point must be 40, 50 or 60. Therefore, the system will calculate the benefit plan values at pay point 30 and then calculate the adjustment after that. \\
''Action: Accumulate'' – this will accumulate the adjustment (+ or -) to the benefit calculated amount.\\
''Pay Point'' – this must be after the pay point where the benefit plans are calculated. If you have the benefit plans being calculated at pay point 30, the pay component pay point in IPPC must be 40, 50 or 60. Therefore, the system will calculate the benefit plan values at pay point 30 and then calculate the adjustment after that. \\
At line 32 changed one line
__Enter Sundry__
__Enter Sundry in IPSN__
At line 34 changed 4 lines
Frequency: One Time
Start Date and End Date: pick a date within the pay period you want the adjustment to be processed.
PC: enter either the employee or employer pay component to be adjusted.
Value: enter the amount to be adjusted (10.00 or -10.00 for example).
''Frequency:'' One Time \\
''Start Date and End Date:'' Pick a date within the pay period you want the adjustment to be processed. \\
''PC:'' Enter either the employee or employer pay component to be adjusted. \\
''Value:'' Enter the amount to be adjusted (10.00 or -10.00 for example). \\
At line 39 added 2 lines
__Note:__
In the ''Line Info'' tab of the IPSN screen, the Pay Point Type will default from the pay component.