This page (revision-4) was last changed on 26-Nov-2021 10:22 by Meg McFarland

This page was created on 26-Nov-2021 10:22 by KateN

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
4 26-Nov-2021 10:22 1 KB Meg McFarland to previous
3 26-Nov-2021 10:22 1 KB Meg McFarland to previous | to last
2 26-Nov-2021 10:22 1 KB eyeung to previous | to last
1 26-Nov-2021 10:22 1 KB KateN to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 13 changed 2 lines
|01|Roll Forward to Day in Curr\\Month|Specify the <BC Value> on the coverage component.\\Must be entered as DD (31 for the end of the\\month.)\\Rolls the expiration date forward to this day in\\the current or following month whichever is past\\the original expiration date month.\\Used when benefits may only expire on a specified\\day of the month|\\|[B0200|BC-B0200]
|02*|Roll Back to Day in Prev\\Month|Specify the <BC Value> on the coverage component.\\Must be entered as DD (31 for the end of the\\month.)\\Rolls the expiration date back to this day in the\\previous month.\\Used when benefit may only expire on a specified\\day of the month.|\\|[B0200|BC-B0200]
|01|Roll Forward to Day in Curr\\Month|Specify the <BC Value> on the coverage component.\\Must be entered as DD (31 for the end of the month.)\\Rolls the expiration date forward to the current month end date.\\Note: If the benefit plan may only expire on a specific day of the month, please discuss with our consultants.|\\|[B0200|BC-B0200]
|02*|Roll Back to Day in Prev\\Month|Specify the <BC Value> on the coverage component.\\Must be entered as DD (31 for the end of the month.)\\Rolls the expiration date back to the month end date in the previous month.\\Note: If the benefit plan may only expire on a specific date of the month, please discuss with our consultants.|\\|[B0200|BC-B0200]