This page (revision-8) was last changed on 26-Nov-2021 10:22 by JEscott

This page was created on 26-Nov-2021 10:22 by JEscott

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
8 26-Nov-2021 10:22 1 KB JEscott to previous
7 26-Nov-2021 10:22 881 bytes JEscott to previous | to last
6 26-Nov-2021 10:22 881 bytes JEscott to previous | to last
5 26-Nov-2021 10:22 869 bytes JEscott to previous | to last
4 26-Nov-2021 10:22 746 bytes JEscott to previous | to last
3 26-Nov-2021 10:22 744 bytes JEscott to previous | to last
2 26-Nov-2021 10:22 190 bytes JEscott to previous | to last
1 26-Nov-2021 10:22 155 bytes JEscott to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 changed one line
!!!Basic One Step Open Enrollment Approval
!!!BASIC ONE STEP APPROVAL PROCESS FOR OPEN ENROLLMENT
At line 3 added 16 lines
[{Image src='BASIC OE APPROVAL PROCESS.JPG' width='575' link='attach/BASIC OE APPROVAL PROCESS.JPG'}]
[{Image src='OE APPROVAL REQUIRED.JPG' width='500' link='attach/OE APPROVAL REQUIRED.JPG'}]
The where clause above uses a derived column, DRV_APPROVAL_REQUIRED, to capture the plans (if any) within the open enrollment have the [Approval Required|APPROVAL_REQUIRED] field in [IBPN] set to Approval Required.
If one plan within the employee’s open enrollment requires approval, this will call the above approval process.
If no plans in the employee’s open enrollment require approval, then no approval process will be called. However, the enrollment must still be approved in order for it to be processed.
----
![Notes|Edit:Internal.BASIC+ONE+STEP+OE+APPROVAL]
[{InsertPage page='Internal.BASIC+ONE+STEP+OE+APPROVAL' default='Click to create a new notes page'}]