This page (revision-4) was last changed on 26-Nov-2021 10:22 by RForbes

This page was created on 26-Nov-2021 10:22 by KateN

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
4 26-Nov-2021 10:22 3 KB RForbes to previous
3 26-Nov-2021 10:22 3 KB RForbes to previous | to last B0005 - B02999 ==> B0005 to B0299
2 26-Nov-2021 10:22 3 KB KateN to previous | to last
1 26-Nov-2021 10:22 3 KB KateN to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 changed 3 lines
!!!Preprocess/Qualification (B0005 - B0299)
\\
\\
!!!Components for Preprocess/Qualification (B0005 - B0299)
At line 5 changed 2 lines
\\
\\
At line 8 changed 2 lines
\\
\\
At line 11 changed 2 lines
\\
\\
At line 41 changed 5 lines
\\
\\
#Premium Start date will not work if it is an earlier date than the Plan Effective date.\\ \\The effective date of the IBEN record controls the benefit. If the plan is not yet effective, there is no point in trying to take a premium – the plan will be skipped by UPCALC.\\ \\Same thing applies for expiration date and premium end. There is no point in making the premium stop AFTER the expiration date of the record. If the employee is not in the plan, they will not have their premium amount calculated.\\
#BC action should be ‘Calculate’\\ \\The BC action for any date component (B0020 – B0270) does not need to be anything but ‘calculate’. The dates are already on the IBEL/IBEN as separate fields.
#‘Allow Value Override’ is only necessary on ‘final date’ values B0070, B0130, B0140 are final storage BC’s for Effective, Eligible, Premium Start dates.\\ \\B0200, B0260, B0270 are final storage BC’s for Expiration, Eligible Expiry, Premium End dates\\ \\These components are the only ones that the user would override. Toggle should not be on for ‘interim’ date values.\\
#Premium Start date will not work if it is an earlier date than the Plan Effective date.\\ \\The effective date of the IBEN record controls the benefit. If the plan is not yet effective, there is no point in trying to take a premium – the plan will be skipped by UPCALC.\\ \\Same thing applies for expiration date and premium end. There is no point in making the premium stop AFTER the expiration date of the record. If the employee is not in the plan, they will not have their premium amount calculated.\\ \\
#BC action should be ‘Calculate’\\The BC action for any date component (B0020 – B0270) does not need to be anything but ‘calculate’. The dates are already on the IBEL/IBEN as separate fields.\\ \\
#‘Allow Value Override’ is only necessary on ‘final date’ values B0070, B0130, B0140 are final storage BC’s for Effective, Eligible, Premium Start dates.\\ \\B0200, B0260, B0270 are final storage BC’s for Expiration, Eligible Expiry, Premium End dates\\ \\These components are the only ones that the user would override. Toggle should not be on for ‘interim’ date values.\\ \\
At line 42 added 5 lines
----
![Notes|Edit:Internal.B0005+to+B0299]
[{InsertPage page='Internal.B0005+to+B0299' default='Click to create a new notes page'}]